CDC Thermix insulates building envelopes and building services: façades, roofs and attics, and the pipes, ducts and tanks behind the plant-room door. Every job is a sequence of layers, and every layer has one thing to do.
Cool tints on this site stand for the weather side of a construction, warm tints for the heated side. The work happens in between.
Layer 02 — Services
What we do
Three services, one rule: keep the layer continuous.
Insulation works as well as its weakest junction. Whether we are covering a wall, a roof slope or a run of pipework, the job is planned around edges, corners, penetrations and supports, because that is where gaps appear.
Façade insulation
External wall insulation fixed to the outside of the building: insulation boards bonded and fixed to the wall, a reinforced base coat over them, and a finish render on top.
Insulation for building services rather than the building fabric: heating and cooling pipework, ventilation ducts, tanks, and the fittings in plant rooms.
This is a typical external wall insulation build-up, drawn as a section from the inside of the building to the outside. Select a layer to slide it out of the wall and read what it is there to do.
Schematic section, not to scale. The build-up for a real building is chosen after a survey.
The structure that is already there: masonry, block or concrete. It carries the whole system, so it is checked first. Loose render, flaking paint, damp patches and uneven areas are dealt with before anything is fixed to it.
A cement-based adhesive bonds each board to the wall and takes up small irregularities in the surface, so the boards sit flat and in one plane. Mechanical fixings are added through the boards where the wall and the system call for them.
The layer that does the insulating. Boards are laid in a staggered pattern with tight joints and cut neatly around openings. Any gaps are filled with insulation rather than adhesive, so the joints do not become easy paths for heat.
A glass-fibre mesh pressed into the wet base coat. It spreads the stresses from temperature changes and small movements across the surface, which keeps the render from cracking along board joints. Extra patches go at the corners of windows and doors. It is drawn as its own band so you can see it; on the wall it sits inside the base coat.
A mortar layer that covers the boards and embeds the mesh. It forms the tough, even shell that protects the insulation from knocks and weather, and gives the finish a uniform surface to key into.
The visible surface: a primer and a thin decorative render in the texture and colour chosen for the building. It sheds rain and gives the façade its final appearance.
Layer 04 — Outside / inside
The boundary
Where the line between outside and inside is drawn.
Insulation does not produce heat. It decides where the boundary between the heated interior and the weather sits, and how unbroken that boundary is. Drag the divider to move the line.
Continuity. A layer that stops at a balcony slab, a window reveal or a pipe support leaves a bridge across the boundary.
Moisture. Indoor air carries water vapour. Where the boundary sits decides where that vapour could condense, so vapour control is planned together with the insulation.
Protection. Insulation that gets wet or damaged stops doing its job, so every system ends in a layer that shields it.
Outside
Inside
Illustration only. Drag the hatched divider, or focus it and use the arrow keys. The panel shows an idea; it does not represent measured temperatures or any saving.
Layer 05 — Sequence
How a job runs
From first message to handover.
The order is the same for a façade, a roof or a plant room. What changes is the content of each step.
Enquiry
You tell us what the building is, what you want insulated and what you already know about its construction. Photos and drawings help.
Survey
We look at the surfaces, junctions and access on site: what the substrate is, what condition it is in, and which details will need particular care.
Proposal
You receive a written scope: the build-up we propose layer by layer, what is included, what is not, and the order of work.
Preparation
Access is set up, surfaces are repaired and cleaned, and fixtures that are in the way are removed or extended.
Installation
The layers go on in sequence, each given the drying or curing time it needs before the next one covers it.
Checks and handover
We walk the finished work with you, close out the remaining items and explain how to look after it.
Layer 06 — Next step
Get in touch
Start with a description of the building.
Send a short message with the type of building, the part you want insulated and anything you know about how it is built. We reply by email.