Layer 01 — Façade

Service 01 — Building envelope

Façade insulation

An external wall insulation system wraps the building in a continuous layer on the outside of its walls: insulation boards fixed to the masonry, a reinforced base coat over them, and a finish render on top. The work happens outside, so the rooms stay in use while it is done.

In short

  • What it is. Insulation boards, reinforcement and render applied to the outer face of existing or new walls.
  • Where it suits. Masonry, block and concrete walls with a sound surface, or one that can be made sound.
  • What changes. The façade gets a new finish; reveals, sills and roof edges are adjusted for the added thickness.

Layer 02 — Scope

What the work includes

Six stages, each one covered by the next.

Most of a façade system disappears under the layer that follows it. That is why each stage is finished and checked before it is closed in. The layers themselves are explained in the interactive wall section on the home page.

Substrate survey and preparation

We check what the wall is made of and what state it is in. Loose render is removed, hollow or crumbling areas are repaired, and surfaces are cleaned so that adhesive can bond to them.

Setting out and base rail

A starter track is fixed level along the bottom of the insulated area. It supports the first row of boards and sets the line that every row above it follows.

Insulation boards

Boards are bonded with adhesive in a staggered pattern with tight joints, and secured with mechanical fixings where required. The surface is checked for flatness and rasped level where needed.

Reinforcement

Beads at external corners, diagonal mesh patches at the corners of windows and doors, then a full layer of mesh embedded in the base coat with overlapped joints.

Finish render

Once the base coat has cured it is primed and finished with a thin-coat render in the agreed texture and colour, applied one complete elevation or section at a time to avoid visible joins.

Openings and edges

Window reveals and heads are insulated, sills are replaced or extended, and the joints to frames are sealed so that water cannot get behind the system.

Layer 03 — Details

Elevation with callouts

The details that decide the result.

Large flat areas of wall are the straightforward part. Most of the care on a façade goes into the places where the insulation meets something else.

Elevation of an insulated façade with seven numbered details A simple house front with callouts at the plinth, base rail, corner, window reveal, sill, roof edge and a downpipe. 1 2 3 4 5 6 7
Schematic elevation, not to scale and not a drawing of a specific building.
  1. Plinth. The zone near the ground takes splashing water and knocks, so it gets moisture-tolerant insulation and a more robust finish.
  2. Base rail. The level starting line for the boards, with a drip edge so that water runs clear of the wall below.
  3. Corners. Boards are interlocked at corners and protected with a bead under the mesh.
  4. Window reveals. Insulation is returned into the reveal so that the frame is not left as a cold edge.
  5. Sills. Thicker walls need deeper sills, with end caps and a fall that throws water clear.
  6. Roof edge. The top of the system is covered by the eaves or a capping so that rain cannot enter from above.
  7. Fixtures. Downpipes, lights, taps, vents and brackets are refitted on extended or insulated mounts.

Layer 04 — Sequence

Survey to handover

How a façade job runs.

Adhesive and render work depends on the weather: it is not carried out in frost, in heavy rain or on surfaces in strong direct sun. The programme is planned with that in mind.

  1. Survey

    Wall construction, condition, moisture, existing finishes and every fixture on the façade are recorded.

  2. Scope and build-up

    You receive the proposed system layer by layer, the finish options and the sequence of work.

  3. Access and protection

    Scaffolding goes up; windows, doors, paving and planting are covered.

  4. Preparation

    Repairs, cleaning, removal of fixtures and fitting of the base rail.

  5. Boards

    Bonding, fixing and levelling the insulation, including the reveals.

  6. Base coat and mesh

    Reinforcement at corners and openings, then the full mesh layer. This coat is left to cure.

  7. Finish and refit

    Primer, finish render, new sills, sealing, and fixtures back in place.

  8. Handover

    A joint walk-round, remaining items closed out, care advice given, access removed.

Layer 05 — Prepare & questions

Before we start

What to prepare.

  • Clear access around the walls: move stored items, furniture and vehicles away from the façade.
  • Tell us about anything fixed to the walls, such as alarm boxes, cables, dishes, awnings and signs.
  • Trim planting that touches the walls, or agree with us how it will be protected.
  • Check whether a change to the façade needs a permit or the consent of neighbours or co-owners. We can supply a technical description of the works.
  • Think about colour and texture. The finish is chosen before it is ordered, not on the scaffold.

Common questions

Façade FAQ.

Can we stay in the building while the work is done?

Yes. The work is on the outside. Expect scaffolding at the windows, some noise while boards are fixed, and windows that have to stay closed while render is applied around them.

What happens to sills, downpipes and lights?

They are removed at the start and refitted at the end. Because the wall becomes thicker, sills are usually replaced with deeper ones, and downpipes and fittings are moved outwards on new mounts.

My wall has damp patches or cracks. Can it still be insulated?

The cause is dealt with first. Insulation fixed over a wet or moving wall hides a problem instead of solving it, so the survey looks for the source, whether that is a leaking gutter, rising damp or structural movement, and the repair is agreed before the system goes on.

Which insulation material will you use?

That depends on the wall, the height of the building, fire and moisture requirements and the finish you want. The proposal names the material and thickness for each area and explains the reason.

How long does it take?

It depends on the size of the façade, the number of openings and the weather, because several layers need time to cure. You get a programme with the proposal instead of a guess on a web page.