Substrate survey and preparation
We check what the wall is made of and what state it is in. Loose render is removed, hollow or crumbling areas are repaired, and surfaces are cleaned so that adhesive can bond to them.
Layer 01 — Façade
Service 01 — Building envelope
An external wall insulation system wraps the building in a continuous layer on the outside of its walls: insulation boards fixed to the masonry, a reinforced base coat over them, and a finish render on top. The work happens outside, so the rooms stay in use while it is done.
In short
Layer 02 — Scope
What the work includes
Most of a façade system disappears under the layer that follows it. That is why each stage is finished and checked before it is closed in. The layers themselves are explained in the interactive wall section on the home page.
We check what the wall is made of and what state it is in. Loose render is removed, hollow or crumbling areas are repaired, and surfaces are cleaned so that adhesive can bond to them.
A starter track is fixed level along the bottom of the insulated area. It supports the first row of boards and sets the line that every row above it follows.
Boards are bonded with adhesive in a staggered pattern with tight joints, and secured with mechanical fixings where required. The surface is checked for flatness and rasped level where needed.
Beads at external corners, diagonal mesh patches at the corners of windows and doors, then a full layer of mesh embedded in the base coat with overlapped joints.
Once the base coat has cured it is primed and finished with a thin-coat render in the agreed texture and colour, applied one complete elevation or section at a time to avoid visible joins.
Window reveals and heads are insulated, sills are replaced or extended, and the joints to frames are sealed so that water cannot get behind the system.
Layer 03 — Details
Elevation with callouts
Large flat areas of wall are the straightforward part. Most of the care on a façade goes into the places where the insulation meets something else.
Layer 04 — Sequence
Survey to handover
Adhesive and render work depends on the weather: it is not carried out in frost, in heavy rain or on surfaces in strong direct sun. The programme is planned with that in mind.
Wall construction, condition, moisture, existing finishes and every fixture on the façade are recorded.
You receive the proposed system layer by layer, the finish options and the sequence of work.
Scaffolding goes up; windows, doors, paving and planting are covered.
Repairs, cleaning, removal of fixtures and fitting of the base rail.
Bonding, fixing and levelling the insulation, including the reveals.
Reinforcement at corners and openings, then the full mesh layer. This coat is left to cure.
Primer, finish render, new sills, sealing, and fixtures back in place.
A joint walk-round, remaining items closed out, care advice given, access removed.
Layer 05 — Prepare & questions
Before we start
Common questions
Yes. The work is on the outside. Expect scaffolding at the windows, some noise while boards are fixed, and windows that have to stay closed while render is applied around them.
They are removed at the start and refitted at the end. Because the wall becomes thicker, sills are usually replaced with deeper ones, and downpipes and fittings are moved outwards on new mounts.
The cause is dealt with first. Insulation fixed over a wet or moving wall hides a problem instead of solving it, so the survey looks for the source, whether that is a leaking gutter, rising damp or structural movement, and the repair is agreed before the system goes on.
That depends on the wall, the height of the building, fire and moisture requirements and the finish you want. The proposal names the material and thickness for each area and explains the reason.
It depends on the size of the façade, the number of openings and the weather, because several layers need time to cure. You get a programme with the proposal instead of a guess on a web page.