Warm air rises, so the top of a building is where insulation has the most to hold back. Where it goes depends on one question: is the space under the roof a room, or only a roof void?
Unused loft. Insulate the floor of the loft and keep the roof space above it cold and ventilated.
Room in the roof. Insulate along the slope, between and under the rafters.
Flat roof. Insulate on the deck, under the waterproofing, with vapour control beneath.
Layer 02 — Three situations
What the work includes
Three roofs, three approaches.
The material matters less than putting the insulation in the right place for the way the space is used, and closing the gaps around it.
Loft floor
For lofts that nobody lives in. Insulation is laid between the ceiling joists, then a second layer across them to cover the timber.
Hatch insulated and sealed
Pipes and tanks in the cold space insulated
Raised walkway or deck where access is needed
Eaves ventilation kept open
Pitched roof at rafter level
For attic rooms and conversions. Insulation is fitted tightly between the rafters and a continuous layer is added beneath them.
Vapour control layer on the room side
Junctions at rooflights, dormers and knee walls
Service zone behind the lining
Plasterboard or boarding to finish
Flat roof
Rigid insulation boards are laid over a vapour control layer on the roof deck and covered by the waterproofing.
Falls towards the outlets
Upstands at edges and parapets
Rooflights, vents and other penetrations
Waterproofing repaired or renewed with the job
Layer 03 — Build-up
Interactive section
A pitched roof, layer by layer.
A section through a roof slope insulated at rafter level, from the weather side down to the room. Select a layer to slide it out of the stack.
Schematic section, not to scale. Rafters are shown as the wavy-hatched blocks inside layer 3.
Tiles, slates or sheets on battens. This is the weather layer. It is not part of the insulation, but its condition is checked first, because insulation below a leaking roof will get wet.
A membrane under the covering that stops wind-driven rain and snow from reaching the insulation while letting water vapour escape outwards.
Insulation cut slightly oversize and friction-fitted between the rafters so that there are no gaps at the sides. Any ventilation gap the roof design needs is kept clear above it.
A continuous layer across the underside of the rafters. Timber conducts heat more readily than insulation does, so this layer covers each rafter instead of leaving it as a stripe through the build-up.
A membrane on the warm side with taped laps and sealed edges. It limits how much moist indoor air can enter the roof build-up and also serves as the airtight layer. Every cable and pipe that passes through it is sealed.
Plasterboard or boarding fixed on battens. The space behind it lets cables run without puncturing the vapour control layer.
Layer 04 — Moisture
Cold side
Ventilation: let moisture out.
Whatever moisture does reach the cold side of the insulation needs a way to leave. Depending on the roof, that means a breathable underlay, a clear ventilation path from eaves to ridge, or both.
Insulation is kept back from eaves vents so the airflow is not blocked.
In a cold loft, the roof void above the insulation stays ventilated.
On a flat roof, the choice between a ventilated and an unventilated build-up is made at the survey, not on the day.
Warm side
Vapour control: keep moist air out of the build-up.
Everyday life puts water vapour into indoor air. If that air reaches a cold surface inside the roof, it can condense there. The vapour control layer is the barrier against this, and it only works when it is continuous.
Laps are taped and edges are sealed to the walls.
Downlights, cables, pipes and the loft hatch are each closed off.
Later trades are told where the layer is, so it is not cut by accident.
Layer 05 — Sequence & questions
Survey to handover
How the work runs.
Survey
We inspect the covering from outside where possible and the structure from inside: timbers, existing insulation, ventilation, signs of leaks or condensation.
Proposal
The build-up for your roof, layer by layer, with what happens at the eaves, hatch, rooflights and chimneys.
Preparation
Access and protection inside the building. Old insulation that is wet or compressed is removed where needed.
Installation
Insulation first, then vapour control with every joint taped, then lining or decking.
Handover
Where possible we show you the layers before they are closed in, and explain what should not be disturbed later.
What to prepare
Empty the loft or attic, or at least the areas we will work in.
Clear the route from the entrance to the hatch or the attic stairs.
Tell us about leaks, stains, mould or draughts you have noticed, and when they appear.
Tell us what the space will be used for afterwards. It changes where the insulation goes.
Mention planned work such as new rooflights, solar panels or rewiring, so the order of trades can be agreed.
Should the insulation go on the loft floor or along the roof slope?
If nobody uses the roof space as a room, the floor is usually the simpler place: there is less area to cover and the roof void stays ventilated. If the space is, or will become, a room, the insulation has to follow the slope so that the room sits inside the insulated envelope.
There is already some insulation up there. Does it have to come out?
Not necessarily. Dry insulation in good condition can often be left and added to. Insulation that is wet, compressed or contaminated is removed, and the reason it got wet is found first.
Can I still use the loft for storage?
Yes, with a raised deck built above the insulation. Boards laid directly on top squash it, and squashed insulation does less.
Do you need to remove the roof tiles?
Not for insulation fitted from the inside. If the roof covering is being renewed anyway, insulating from above at the same time is worth discussing, because the rooms below are not disturbed.
What about a flat roof that already leaks?
The waterproofing is repaired or renewed as part of the job. Insulation is not added under a covering that lets water in.